What a roof replacement actually costs
Installed cost per square by material, what moves the number, and a worked takeoff.
11 min
23 guides. Every figure on them is read from a primary source and stamped with the date it was read.
4 guides
Installed cost per square by material, what moves the number, and a worked takeoff.
11 min
Every common pitch from 1/12 to 12/12 with its angle, area multiplier and walkability.
7 min
The trade's only unit: 100 square feet, and how squares become bundles and dollars.
6 min
Crew production rates and what pitch, storey height and tear-off do to the labour line.
8 min
6 guides
Material-only and installed cost for 3-tab, architectural and designer shingles.
9 min
Exposed-fastener, standing seam and stone-coated steel against installed cost per square.
10 min
Panel width, clip type and site-formed versus shop-formed, and what each does to the bid.
8 min
Per-square installed cost, the structural load question, and where synthetic pays.
8 min
Rated life against observed life, and the four things that shorten it most.
7 min
Felt, synthetic and ice-and-water membrane — where code requires each one.
7 min
7 guides
What each common repair costs, and where repair stops paying and replacement starts.
9 min
Step, counter, apron, valley and pitch-transition flashing, drawn and explained.
8 min
Reflash against patch, the reglet cut, the cricket, and what masonry work adds.
7 min
Sheathing per sheet, tear-off, and the signs a deck has to come off with the shingles.
7 min
Why dams form, and the ventilation, insulation and membrane fixes that stop them.
8 min
Reading hail and wind damage on the roof, tiered from cosmetic to structural.
9 min
6 guides
Deck, underlayment, starter, field, ridge — the sequence and the nail pattern.
10 min
Eave before underlayment, rake after — the order, the overhang and the code behind it.
6 min
Federal wage data by percentile and state, and how crew pay is actually structured.
8 min
When a re-roof needs a permit, the layer limit, and the inspections it triggers.
7 min
ACV against RCV, recoverable depreciation, the adjuster meeting and supplements.
10 min