A printable contract skeleton: scope, payment schedule, change orders, warranty.
9 clauses · printable
4 tools · 6 guides
The paperwork around the roof: bids, contracts, permits, claims — and how the work is actually laid.

A printable contract skeleton: scope, payment schedule, change orders, warranty.
9 clauses · printable
A printable invoice that carries the takeoff line items straight through to the total.
line items · $ total
Linear feet, profile and material to an installed range with downspouts counted.
linear ft · $ / ft · range
Ground snow load to flat-roof and sloped-roof load using the ASCE 7 factors.
psf ground → psf roof
Deck, underlayment, starter, field, ridge — the sequence and the nail pattern.
10 min
Eave before underlayment, rake after — the order, the overhang and the code behind it.
6 min
Federal wage data by percentile and state, and how crew pay is actually structured.
8 min
When a re-roof needs a permit, the layer limit, and the inspections it triggers.
7 min
ACV against RCV, recoverable depreciation, the adjuster meeting and supplements.
10 min